Erzherzog-Karl-Strasse 100-102, Vienna

Project information

Procedure
Selection procedure
Client
-
Principal
-
Address
Erzherzog-Karl-Strasse 100-102, 1220 Vienna
Start of planning
10/2019
Start of construction works
06/2021
Completion
10/2022
Construction costs
-
Size of order
Overall planning

There is a new, privately financed residential complex being built right on the corner of Erzherzog-Karl-Strasse/Tietzestrasse, in the 22nd district of Vienna. 33 high-quality residential units with 2 to 4 rooms each are being built on the property in two blocks. The location is conveniently situated right by the 94A bus stop at “Polgarstraße” and close to the “Erzherzog-Karl-Straße” local railway station.
The building, which faces Erzherzog-Karl-Strasse, has six floors above ground. The structure of the building is divided by two oriels in combination with balconies, which, in addition to their design function, also allow the extended living area to be more open. The structure facing Tietzestrasse is similar to the main structure in its design language and has four floors above ground. All of the flats have their own llocated outdoor area such as a loggia, balcony, terrace or private garden. There are bicycle parking spaces and a playground for small children in the inner courtyard.