{"id":14008,"date":"2018-10-05T10:51:47","date_gmt":"2018-10-05T08:51:47","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=14008"},"modified":"2018-11-21T12:11:02","modified_gmt":"2018-11-21T11:11:02","slug":"end-of-construction-messestrasse-ii","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/end-of-construction-messestrasse-ii\/","title":{"rendered":"End of construction Messestrasse II"},"content":{"rendered":"<p>End of construction Messestrasse II 05.10.2018<\/p>\n<p>We are proud to announce that on the 27th of September 2018 the extension building of the Sigmund Freud Private University was handed over to the future users.<br \/>\nWrapped in a golden expanded metal facade, the building fits into its surroundings. The welcoming inner courtyard extends the Freudplatz and invites visitors to linger around with its seating islands.<br \/>\nIn cooperation with STRABAG AG as the main contractor, approx. 15,000 m\u00b2 of gross floor were built for the SFU Forschungs- und Verwaltungs GmbH.<br \/>\nWe would like to thank all those involved in the project for the successful result and the excellent cooperation.<br \/>\nWe also like to wish everyone a lot of success for future projects!<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/messestrasse-ii-vienna\/\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>End of construction Messestrasse II 05.10.2018 We are proud to announce that on the 27th of September 2018 the extension building of the Sigmund Freud Private University was handed over to the future users. Wrapped in a golden expanded metal &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/end-of-construction-messestrasse-ii\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":13998,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-14008","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-end-of-construction"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/14008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=14008"}],"version-history":[{"count":4,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/14008\/revisions"}],"predecessor-version":[{"id":14426,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/14008\/revisions\/14426"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/13998"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=14008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=14008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=14008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}