{"id":17734,"date":"2019-11-04T10:08:07","date_gmt":"2019-11-04T09:08:07","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=17734"},"modified":"2019-11-05T10:14:01","modified_gmt":"2019-11-05T09:14:01","slug":"construction-progress-hofwiese-mitterndorf-a-d-fischa-2","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/construction-progress-hofwiese-mitterndorf-a-d-fischa-2\/","title":{"rendered":"Construction progress Hofwiese, Mitterndorf a. d. Fischa"},"content":{"rendered":"<p>Construction progress Hofwiese, Mitterndorf a. d. Fischa 04.11.2019<\/p>\n<p>After a quick installation of the exterior of the building, the facade was installed on both construction elements.\u00a0Inside the building, work is in progress on the interior.\u00a0After finishing the partition walls, the dry walls were set up and the sanitary equipment installed in the apartments.\u00a0At the same time, the work on the exterior facilities is progressing well.\u00a0The foundations for the outbuildings and parking lots were concreted in the middle of the exterior facilities and all pathways and parking lots will soon be asphalted. The residential building is expected to be finished until the end of November.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/hofwiese-mitterndorf-a-d-fischa\/\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction progress Hofwiese, Mitterndorf a. d. Fischa 04.11.2019 After a quick installation of the exterior of the building, the facade was installed on both construction elements.\u00a0Inside the building, work is in progress on the interior.\u00a0After finishing the partition walls, the &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/construction-progress-hofwiese-mitterndorf-a-d-fischa-2\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":17728,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-17734","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/17734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=17734"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/17734\/revisions"}],"predecessor-version":[{"id":17736,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/17734\/revisions\/17736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/17728"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=17734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=17734"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=17734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}