{"id":23589,"date":"2021-07-21T12:08:32","date_gmt":"2021-07-21T10:08:32","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=23589"},"modified":"2021-07-21T12:08:32","modified_gmt":"2021-07-21T10:08:32","slug":"cumberlandstrasse-38-vienna-the-construction-work-is-progressing-very-well","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/cumberlandstrasse-38-vienna-the-construction-work-is-progressing-very-well\/","title":{"rendered":"Cumberlandstrasse 38, Vienna &#8211; The construction work is progressing very well"},"content":{"rendered":"<p>We are happy to have reached the first big milestone. The foundation panel was completely built and we celebrated this with a small barbecue at the construction site. Some walls in the basement have already been concreted in the southern part of the project and some of the ceilings are already in place.\u00a0In the northern part, the progress is also continuing very fast, the ceiling above the first floor was concreted and most of the walls on the second floor are already finished.\u00a0The ventilation systems in the northern courtyards were already installed, the waterproofing work in this area continues smoothly and the base for the north-facing enclosure is mostly concreted.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/cumberlandstrasse-38-vienna\/\" target=\"_blank\" rel=\"noopener noreferrer\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are happy to have reached the first big milestone. The foundation panel was completely built and we celebrated this with a small barbecue at the construction site. Some walls in the basement have already been concreted in the southern &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/cumberlandstrasse-38-vienna-the-construction-work-is-progressing-very-well\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":23579,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-23589","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/23589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=23589"}],"version-history":[{"count":2,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/23589\/revisions"}],"predecessor-version":[{"id":23592,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/23589\/revisions\/23592"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/23579"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=23589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=23589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=23589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}