{"id":25067,"date":"2022-01-19T11:13:17","date_gmt":"2022-01-19T10:13:17","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=25067"},"modified":"2022-01-19T11:13:17","modified_gmt":"2022-01-19T10:13:17","slug":"canisianum-innsbruck-the-installation-of-the-interior-furnishing-work-is-progressing-rapidly","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/canisianum-innsbruck-the-installation-of-the-interior-furnishing-work-is-progressing-rapidly\/","title":{"rendered":"Canisianum, Innsbruck \u2013 The installation of the interior furnishing work is progressing rapidly"},"content":{"rendered":"<p class=\"WGATextohneEinzug\"><span lang=\"DE\">The painting and the tiling work are progressing rapidly in both the southern and the northern wings. At the same time, the HKLS installations in the kitchens of the south wing have been prepared accordingly.<br \/>\n<\/span><span lang=\"DE\">The carpentry work in the study rooms has also progressed smoothly and the interior furnishings are being diligently installed.<br \/>\n<\/span><span lang=\"DE\">At the same time, electrical work in the north wing continues to be completed. <\/span><span lang=\"DE\">The existing frames are currently being painted or coated and the old terrazzo floor is currently undergoing renovation and polishing.<\/span><\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/canisianum-innsbruck\/\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The painting and the tiling work are progressing rapidly in both the southern and the northern wings. At the same time, the HKLS installations in the kitchens of the south wing have been prepared accordingly. The carpentry work in the &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/canisianum-innsbruck-the-installation-of-the-interior-furnishing-work-is-progressing-rapidly\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":25065,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-25067","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/25067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=25067"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/25067\/revisions"}],"predecessor-version":[{"id":25068,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/25067\/revisions\/25068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/25065"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=25067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=25067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=25067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}