{"id":25415,"date":"2022-02-21T11:56:58","date_gmt":"2022-02-21T10:56:58","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=25415"},"modified":"2022-02-21T11:56:58","modified_gmt":"2022-02-21T10:56:58","slug":"effenbergplatz-building-site-12-vienna-the-ground-floor-is-beginning-to-take-shape","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/effenbergplatz-building-site-12-vienna-the-ground-floor-is-beginning-to-take-shape\/","title":{"rendered":"Effenbergplatz building site 1+2, Vienna \u2013 The ground floor is beginning to take shape"},"content":{"rendered":"<p class=\"WGATextohneEinzug\"><span lang=\"DE\">The two cranes at the Effenbergplatz are no longer stationary. <\/span><span lang=\"DE\">Over the past couple of weeks, quite a lot has been going on and the building is now rapidly rising from the construction pit. <\/span><span lang=\"DE\">The ground floor footprint is now clearly recognisable and takes up almost all of the site&#8217;s surface area. <\/span><span lang=\"DE\">In the basement, the last walls have been completed and the basement ceiling will be formed. <\/span><span lang=\"DE\">The first two sections of a total of five were already concreted.<\/span><\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/effenbergplatz-building-site-12-vienna\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The two cranes at the Effenbergplatz are no longer stationary. Over the past couple of weeks, quite a lot has been going on and the building is now rapidly rising from the construction pit. The ground floor footprint is now &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/effenbergplatz-building-site-12-vienna-the-ground-floor-is-beginning-to-take-shape\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":25411,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[35,38],"tags":[],"class_list":["post-25415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-start","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/25415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=25415"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/25415\/revisions"}],"predecessor-version":[{"id":25416,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/25415\/revisions\/25416"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/25411"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=25415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=25415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=25415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}