{"id":29442,"date":"2023-04-03T08:36:19","date_gmt":"2023-04-03T06:36:19","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=29442"},"modified":"2023-04-03T08:45:04","modified_gmt":"2023-04-03T06:45:04","slug":"hochwaldweg-4-vienna-construction-completion","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/hochwaldweg-4-vienna-construction-completion\/","title":{"rendered":"Hochwaldweg 4, Vienna \u2013 Construction completion"},"content":{"rendered":"<p>We are pleased to announce that the residential complex at Hochwaldweg 4 in Vienna&#8217;s 22nd district has been completed and is waiting for its future residents. The eleven residential units, which extend over four floors, all have an open space in the form of a balcony or terrace. The combination of extensive windows and the garden area at the front mean that a high level of living comfort is guaranteed. This building project also benefits from good connections to the public transport network and the proximity to the old Danube.<br \/>\nWe would like to thank everyone involved in the project for their excellent cooperation and are looking forward to future projects.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/hochwaldweg-4-vienna\/\" target=\"_blank\" rel=\"noopener noreferrer\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are pleased to announce that the residential complex at Hochwaldweg 4 in Vienna&#8217;s 22nd district has been completed and is waiting for its future residents. The eleven residential units, which extend over four floors, all have an open space &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/hochwaldweg-4-vienna-construction-completion\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":29434,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-29442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-end-of-construction"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/29442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=29442"}],"version-history":[{"count":2,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/29442\/revisions"}],"predecessor-version":[{"id":29475,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/29442\/revisions\/29475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/29434"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=29442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=29442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=29442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}