{"id":30318,"date":"2023-07-03T13:09:24","date_gmt":"2023-07-03T11:09:24","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=30318"},"modified":"2023-07-03T13:09:24","modified_gmt":"2023-07-03T11:09:24","slug":"ellener-hof-bremen-larch-wood-facade-panels-are-installed","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/ellener-hof-bremen-larch-wood-facade-panels-are-installed\/","title":{"rendered":"Ellener Hof, Bremen \u2013 Larch wood fa\u00e7ade panels are installed"},"content":{"rendered":"<p>Both houses are already fitted with the back-ventilated pre-grey larch wood fa\u00e7ade panels, on the exterior system wall from Lukas Lang Building Technologies GmbH. The attic fa\u00e7ade was partially built using conventional construction methods. In this case, the substructure of the rear-ventilated timber fa\u00e7ade is already in place. House 1 can already be seen without the scaffolding. The horizontal division of the houses is made by a fire protection plate. The connectors for the balconies have already been installed in the fa\u00e7ade panels.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/ellener-hof-bremen\/\" target=\"_blank\" rel=\"noopener noreferrer\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Both houses are already fitted with the back-ventilated pre-grey larch wood fa\u00e7ade panels, on the exterior system wall from Lukas Lang Building Technologies GmbH. The attic fa\u00e7ade was partially built using conventional construction methods. In this case, the substructure of &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/ellener-hof-bremen-larch-wood-facade-panels-are-installed\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":30312,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-30318","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/30318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=30318"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/30318\/revisions"}],"predecessor-version":[{"id":30319,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/30318\/revisions\/30319"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/30312"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=30318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=30318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=30318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}