{"id":33709,"date":"2024-05-06T11:42:29","date_gmt":"2024-05-06T09:42:29","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=33709"},"modified":"2024-05-07T11:55:45","modified_gmt":"2024-05-07T09:55:45","slug":"universitaet-augsburg-gleichenfeier","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/universitaet-augsburg-gleichenfeier\/","title":{"rendered":"University of Augsburg \u2013 Topping-out ceremony"},"content":{"rendered":"<p>The topping-out ceremony for the University of Augsburg construction project took place in bright sunshine on 29.04.2024. The shell for the new three-storey research building and the two-storey laboratory building was built on the former parking lot between the physics building and the innovation park. Thanks to the modular construction method, the building was completed in a short time so the the topping-out ceremony was celebrated just a few weeks after. The Bavarian State Minister for Housing, Construction and Transport, Christian Bernreiter, the President of the University of Augsburg, Prof. Dr. Sabine Doering-Manteuffe, representatives of ALHO Systembau GmbH, RWT PLUS ZT GmbH and LeitWerk AG as well as many other project participants accepted the invitation and gathered on the construction site.<\/p>\n<p>In the ceremonial speeches, words of thanks were addressed to all those involved and the rapid, sustainable and climate-friendly construction of the new research building was emphasized. After the traditional topping-out speech, the topping-out crown was raised to the accompaniment of music and afterwards lively discussions over food and drink brought the celebration to a cheerful close.<\/p>\n<p>We would like to say thank you for the successful ceremony and we look forward to the further progress of the construction project and to continuing our successful collaboration.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/university-of-augsburg\/\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The topping-out ceremony for the University of Augsburg construction project took place in bright sunshine on 29.04.2024. The shell for the new three-storey research building and the two-storey laboratory building was built on the former parking lot between the physics &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/universitaet-augsburg-gleichenfeier\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":33706,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[39],"tags":[],"class_list":["post-33709","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-others"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/33709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=33709"}],"version-history":[{"count":3,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/33709\/revisions"}],"predecessor-version":[{"id":33715,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/33709\/revisions\/33715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/33706"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=33709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=33709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=33709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}