{"id":37014,"date":"2025-04-23T11:29:20","date_gmt":"2025-04-23T09:29:20","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=37014"},"modified":"2025-04-23T11:30:53","modified_gmt":"2025-04-23T09:30:53","slug":"architecture-and-bim-in-interaction","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/architecture-and-bim-in-interaction\/","title":{"rendered":"Architecture and BIM in interaction"},"content":{"rendered":"<p>Interactive working and proactive planning characterise our approach to every project. The recently completed new building for FH Campus Wien in Favoriten is a showcase project for our way of working with the digital planning method Building Information Modelling (BIM).<\/p>\n<p>The \u2018House of Health Sciences\u2019 education project was realised in just three years &#8211; from winning the competition to successful completion. In a joint venture with F+P Architekt:innen, a building was created that unites all study and further education programmes as well as research activities in the care sector under one roof.<\/p>\n<p>During the planning phase, data models were developed in a shared \u2018Closed BIM environment\u2019 and handed over to the client as an \u2018Open BIM data model\u2019. Precise communication and coordination posed a particular challenge throughout the planning process &#8211; and consequently proved to be a great success.The final digital model for the building database contains a complete collection of all relevant information and data sets. It forms the basis for efficient and future-oriented building operation during the utilisation phase.<\/p>\n<p>It was an exciting project that taught us a lot, and we look forward to further challenging projects in the future.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/house-of-health-vienna\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Interactive working and proactive planning characterise our approach to every project. The recently completed new building for FH Campus Wien in Favoriten is a showcase project for our way of working with the digital planning method Building Information Modelling (BIM). &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/architecture-and-bim-in-interaction\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":37010,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[39,102],"tags":[],"class_list":["post-37014","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-others","category-bim-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=37014"}],"version-history":[{"count":2,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37014\/revisions"}],"predecessor-version":[{"id":37067,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37014\/revisions\/37067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/37010"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=37014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=37014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=37014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}