{"id":37646,"date":"2025-07-09T10:09:47","date_gmt":"2025-07-09T08:09:47","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=37646"},"modified":"2025-07-09T10:09:47","modified_gmt":"2025-07-09T08:09:47","slug":"hauptstrasse-86-hinterbruehl-complementary-work-on-the-interior","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/hauptstrasse-86-hinterbruehl-complementary-work-on-the-interior\/","title":{"rendered":"Hauptstra\u00dfe 86, Hinterbr\u00fchl \u2013 Complementary work on the interior"},"content":{"rendered":"<p>The progress of construction on the new building at Hauptstra\u00dfe 86 in Hinterbr\u00fchl is now clearly visible.\u00a0 The scaffolding on the street-side fa\u00e7ade has already been removed, showcasing the attractive design.\u00a0On the garden side, the fa\u00e7ade is still under construction but will also soon be completed.\u00a0 The construction work is also progressing rapidly on the interior: the modern bathrooms are currently being completed to offer the future residents a comfortable and stylish setting.\u00a0 In addition, the elegant parquet floors have already been installed, adding a warm and inviting atmosphere to the spaces.<\/p>\n<p>We are proud of the steady progress and look forward to presenting the completed residential building very soon!<\/p>\n<p>&nbsp;<\/p>\n<div class=\"col-md-7\">\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/hauptstrasse-86-hinterbruehl\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The progress of construction on the new building at Hauptstra\u00dfe 86 in Hinterbr\u00fchl is now clearly visible.\u00a0 The scaffolding on the street-side fa\u00e7ade has already been removed, showcasing the attractive design.\u00a0On the garden side, the fa\u00e7ade is still under construction &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/hauptstrasse-86-hinterbruehl-complementary-work-on-the-interior\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":37640,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-37646","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=37646"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37646\/revisions"}],"predecessor-version":[{"id":37647,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37646\/revisions\/37647"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/37640"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=37646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=37646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=37646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}