{"id":37726,"date":"2025-07-18T09:05:53","date_gmt":"2025-07-18T07:05:53","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=37726"},"modified":"2025-07-18T09:05:53","modified_gmt":"2025-07-18T07:05:53","slug":"an-der-schanze-25-vienna-structural-work-and-interior-finishing","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/an-der-schanze-25-vienna-structural-work-and-interior-finishing\/","title":{"rendered":"An der Schanze 25, Vienna \u2013 Structural work and interior finishing"},"content":{"rendered":"<p>The advanced structural work already gives a clear picture of what the terraces of each building will look like. In section D, the fa\u00e7ade construction, consisting of prefabricated elements such as columns and beams, is being installed directly together with the prefabricated walls of each floor. In terms of interior finishing, the substructures of the drywall partitions in the first apartments are already being panelled with plasterboard according to the specific requirements after the necessary electrical and installation cables have been installed. At the same time, the flush-mounted sockets for light switches and power outlets are being installed. The door frames have also already been installed in the prepared drywall partitions.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/an-der-schanze-vienna\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The advanced structural work already gives a clear picture of what the terraces of each building will look like. In section D, the fa\u00e7ade construction, consisting of prefabricated elements such as columns and beams, is being installed directly together with &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/an-der-schanze-25-vienna-structural-work-and-interior-finishing\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":37720,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-37726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=37726"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37726\/revisions"}],"predecessor-version":[{"id":37727,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/37726\/revisions\/37727"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/37720"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=37726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=37726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=37726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}