{"id":39616,"date":"2026-07-30T13:20:21","date_gmt":"2026-07-30T11:20:21","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=39616"},"modified":"2026-07-30T13:20:21","modified_gmt":"2026-07-30T11:20:21","slug":"fischamender-strasse-46-schwadorf-construction-of-the-walls-and-ceilings-of-the-standard-storeys-in-both-building-sections","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/fischamender-strasse-46-schwadorf-construction-of-the-walls-and-ceilings-of-the-standard-storeys-in-both-building-sections\/","title":{"rendered":"Fischamender Stra\u00dfe 46, Schwadorf \u2013 Construction of the walls and ceilings of the standard storeys in both building sections"},"content":{"rendered":"<p>In Building Section 2, the ground floor walls have been completed, whilst in Building Section 1, the walls of the first upper floor have already been constructed. In parallel with this, the necessary preparatory work for the next storeys is being carried out in Building Section 2. This includes the installation of formwork and the creation of reinforcement connections for the ceiling above the ground floor and the walls of the first upper floor. In Building Section 1, this work is already underway for the floor above. The installation of the prefabricated staircases is taking place in parallel with the construction of the floor walls.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/fischamender-strasse-46-schwadorf\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Building Section 2, the ground floor walls have been completed, whilst in Building Section 1, the walls of the first upper floor have already been constructed. In parallel with this, the necessary preparatory work for the next storeys is &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/fischamender-strasse-46-schwadorf-construction-of-the-walls-and-ceilings-of-the-standard-storeys-in-both-building-sections\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":39614,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-39616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=39616"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39616\/revisions"}],"predecessor-version":[{"id":39617,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39616\/revisions\/39617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/39614"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=39616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=39616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=39616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}