{"id":39655,"date":"2026-08-04T13:17:03","date_gmt":"2026-08-04T11:17:03","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=39655"},"modified":"2026-08-04T13:17:03","modified_gmt":"2026-08-04T11:17:03","slug":"wagramer-strasse-112-vienna-work-on-walls-and-ceilings-in-the-basement","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/wagramer-strasse-112-vienna-work-on-walls-and-ceilings-in-the-basement\/","title":{"rendered":"Wagramer Stra\u00dfe 112, Vienna \u2013 Work on walls and ceilings in the basement"},"content":{"rendered":"<p>Wagramer Stra\u00dfe 112, Vienna \u2013 Work on walls and ceilings in the basement<br \/>\nThe work at the construction site at Wagramer Stra\u00dfe 112 in Vienna is progressing well. Following the successful pouring of the floor slab, the current focus is on constructing the basement.<br \/>\nAt the rear of the site, the basement walls have already been fully completed. Formwork for the first ceiling has now begun here. At the same time, intensive work is also underway at the front of the site. Formwork and reinforcement work for the remaining walls is currently in progress there. As a result, the contours of the future building are becoming more tangible \u2013 in particular, the outline of the central stairwell is already clearly visible at the front.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/wagramer-strasse-112-vienna\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Wagramer Stra\u00dfe 112, Vienna \u2013 Work on walls and ceilings in the basement The work at the construction site at Wagramer Stra\u00dfe 112 in Vienna is progressing well. Following the successful pouring of the floor slab, the current focus is &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/wagramer-strasse-112-vienna-work-on-walls-and-ceilings-in-the-basement\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":39653,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-39655","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39655","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=39655"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39655\/revisions"}],"predecessor-version":[{"id":39656,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39655\/revisions\/39656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/39653"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=39655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=39655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=39655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}