{"id":39670,"date":"2026-08-10T11:38:23","date_gmt":"2026-08-10T09:38:23","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=39670"},"modified":"2026-08-10T11:38:23","modified_gmt":"2026-08-10T09:38:23","slug":"shopping-city-seiersberg-we-are-getting-closer-to-completion","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/shopping-city-seiersberg-we-are-getting-closer-to-completion\/","title":{"rendered":"Shopping City Seiersberg \u2013 We are getting closer to completion"},"content":{"rendered":"<p>The comprehensive architectural transformation of the exterior of Shopping City Seiersberg is progressing successfully and on schedule. We have successfully completed a large part of the work! The finishing touches are currently being applied to the fa\u00e7ades of Buildings 3 and 5. The key design elements of the new concept are already fully visible and define the new look of Shopping City Seiersberg. The central visual motif \u2013 the wraparound frame with integrated lighting \u2013 has taken a decisive step forward. The striking LED strip has already been fully installed. The system is currently awaiting final connection by the electricians. Immediately after the cabling has been successfully completed, the lighting control system will be programmed. As a final visual accent to the exterior, the signage for the individual shops will be installed in the coming weeks. These will be precisely integrated into the new, structured fa\u00e7ade grid to complete the overall look.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/shopping-city-seiersberg\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The comprehensive architectural transformation of the exterior of Shopping City Seiersberg is progressing successfully and on schedule. We have successfully completed a large part of the work! The finishing touches are currently being applied to the fa\u00e7ades of Buildings 3 &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/shopping-city-seiersberg-we-are-getting-closer-to-completion\/\">Continued<\/a><\/p>\n","protected":false},"author":9,"featured_media":39662,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-39670","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=39670"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39670\/revisions"}],"predecessor-version":[{"id":39671,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/39670\/revisions\/39671"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/39662"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=39670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=39670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=39670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}