{"id":40268,"date":"2026-11-23T09:29:40","date_gmt":"2026-11-23T08:29:40","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=40268"},"modified":"2026-11-23T09:29:40","modified_gmt":"2026-11-23T08:29:40","slug":"anna-fluegge-strasse-2-3-potsdam-as-deep-as-it-gets-now-the-only-way-is-up","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/anna-fluegge-strasse-2-3-potsdam-as-deep-as-it-gets-now-the-only-way-is-up\/","title":{"rendered":"Anna-Fl\u00fcgge-Stra\u00dfe 2-3, Potsdam &#8211; As deep as it gets &#8211; now the only way is up!"},"content":{"rendered":"<p>The excavation pit has been dug, the soldier pile shoring holds the walls in place, and the groundwater lowering system ensures that no one here needs rubber boots that reach all the way up to their knees.<br \/>\nThere is plenty of activity down at the base of the excavation. The insulation is being laid, and the first reinforcement cages are already standing ready. The lift pit is still missing. The crane overlooks it all from above and has by far the best view of central Potsdam. Next, the foundation slab will be poured so that the building finally has solid ground beneath its feet. After that, the basement walls will be built, and the building will rise towards the sky, floor by floor.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/anna-fluegge-strasse-2-3-potsdam\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The excavation pit has been dug, the soldier pile shoring holds the walls in place, and the groundwater lowering system ensures that no one here needs rubber boots that reach all the way up to their knees. There is plenty &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/anna-fluegge-strasse-2-3-potsdam-as-deep-as-it-gets-now-the-only-way-is-up\/\">Continued<\/a><\/p>\n","protected":false},"author":11,"featured_media":40254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-40268","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/40268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=40268"}],"version-history":[{"count":3,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/40268\/revisions"}],"predecessor-version":[{"id":40271,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/40268\/revisions\/40271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/40254"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=40268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=40268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=40268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}