{"id":40374,"date":"2026-11-24T08:21:00","date_gmt":"2026-11-24T07:21:00","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=40374"},"modified":"2026-11-24T08:21:00","modified_gmt":"2026-11-24T07:21:00","slug":"fischamender-strasse-46-schwadorf-drywall-construction-and-attic-development","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/fischamender-strasse-46-schwadorf-drywall-construction-and-attic-development\/","title":{"rendered":"Fischamender Stra\u00dfe 46, Schwadorf \u2013 Drywall construction and attic development"},"content":{"rendered":"<p>Drywall and installation work is currently being carried out inside both building sections. The walls and service wall linings are already largely boarded on both sides, and the pipework and cabling for the building services have been installed. In the attic, roof windows are being installed and the adjoining areas are being fitted out. Domed rooflights for future roof access are also being installed in the stairwells. These access points will provide access for maintenance of the roof surfaces and the building services equipment on the roof. The railings around the outdoor areas have largely been installed. To protect the garage entrance during heavy rainfall, the structural work on the canopy over the garage ramp has also been completed.<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/fischamender-strasse-46-schwadorf\/\" target=\"_blank\" rel=\"noopener\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drywall and installation work is currently being carried out inside both building sections. The walls and service wall linings are already largely boarded on both sides, and the pipework and cabling for the building services have been installed. In the &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/fischamender-strasse-46-schwadorf-drywall-construction-and-attic-development\/\">Continued<\/a><\/p>\n","protected":false},"author":11,"featured_media":40364,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-40374","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/40374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=40374"}],"version-history":[{"count":1,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/40374\/revisions"}],"predecessor-version":[{"id":40375,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/40374\/revisions\/40375"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/40364"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=40374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=40374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=40374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}