{"id":9149,"date":"2017-12-12T13:13:20","date_gmt":"2017-12-12T12:13:20","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=9149"},"modified":"2017-12-14T13:27:09","modified_gmt":"2017-12-14T12:27:09","slug":"construction-progress-anschuetzgasse","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/construction-progress-anschuetzgasse\/","title":{"rendered":"Construction progress Ansch\u00fctzgasse"},"content":{"rendered":"<p>Construction progress Ansch\u00fctzgasse 12.12.2017<\/p>\n<p>Building work in the Ansch\u00fctzgasse is moving forward quickly. As you can see from the photos, the fa\u00e7ade is just being finalized. Only the enamel glazing is missing from the dormers. The lower construction of the protruding fa\u00e7ade construction has already been installed. Work to install drainage channels is also in full swing.<br \/>\nInside, tiling work has just started on the staircases. Even the railings have already been installed. The suspended ceilings in the corridors are already in place as well. The lights have been installed in the offices.<br \/>\nThe flats are also slowly taking shape. The first residents can move into these in spring 2018.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/anschuetzgasse-1-vienna\/\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction progress Ansch\u00fctzgasse 12.12.2017 Building work in the Ansch\u00fctzgasse is moving forward quickly. As you can see from the photos, the fa\u00e7ade is just being finalized. Only the enamel glazing is missing from the dormers. The lower construction of the &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/construction-progress-anschuetzgasse\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":9142,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-9149","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/9149","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=9149"}],"version-history":[{"count":3,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/9149\/revisions"}],"predecessor-version":[{"id":9154,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/9149\/revisions\/9154"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/9142"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=9149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=9149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=9149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}