{"id":9173,"date":"2017-12-18T15:16:26","date_gmt":"2017-12-18T14:16:26","guid":{"rendered":"https:\/\/www.wg-a.com\/?p=9173"},"modified":"2017-12-19T15:30:46","modified_gmt":"2017-12-19T14:30:46","slug":"construction-progress-cityquartier-wiener-neustadt-4","status":"publish","type":"post","link":"https:\/\/www.wg-a.com\/en\/construction-progress-cityquartier-wiener-neustadt-4\/","title":{"rendered":"Construction progress Cityquartier, Wiener Neustadt"},"content":{"rendered":"<p>Construction progress Cityquartier, Wiener Neustadt 18.12.2017<\/p>\n<p>Building works have been progressing rapidly on plot 2 since the official start of construction on the 27.02.2017,<br \/>\nThe construction of the walls in the area of staircases 1, 2 and 3 on the 3rd floor has been completed. In the area of staircases 2 and 3 building of the walls on the top floor has nearly been completed and in staircase 1 construction of the top floor walls will be started in the next few days.<\/p>\n<p>The prefabricated parts for the element ceilings and walls in the areas around staircase 4 are currently being delivered to the construction site, or the formwork and reinforcements needed for the ground floor are currently being built in the sections where cast-in-situ concrete is being used.<\/p>\n<p>Excavations have already been completed on building plot 1, the granular sub-base is being applied everywhere and the first section of the floor slabs are already being concreted over. Reinforcement is currently being laid for the other sections.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.wg-a.com\/en\/projects\/residential-building-volksbadquartier-gymelsdorfer-gasse-48a-wiener-neustadt\/\">&lt;&lt;see project&gt;&gt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction progress Cityquartier, Wiener Neustadt 18.12.2017 Building works have been progressing rapidly on plot 2 since the official start of construction on the 27.02.2017, The construction of the walls in the area of staircases 1, 2 and 3 on the &hellip; <a href=\"https:\/\/www.wg-a.com\/en\/construction-progress-cityquartier-wiener-neustadt-4\/\">Continued<\/a><\/p>\n","protected":false},"author":4,"featured_media":9167,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-9173","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/9173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/comments?post=9173"}],"version-history":[{"count":3,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/9173\/revisions"}],"predecessor-version":[{"id":9178,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/posts\/9173\/revisions\/9178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media\/9167"}],"wp:attachment":[{"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/media?parent=9173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/categories?post=9173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wg-a.com\/en\/wp-json\/wp\/v2\/tags?post=9173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}