Saltenstrasse 1, Vienna – Construction progress

The first sections of the scaffolding were dismantled, with the fresh, bright white facade of staircase 2 standing out. Inside, the screed has already been completed and the heating phase has now started. At the same time, the installation of the ventilation systems has begun. In the larger part of the building, the finishing work is now progressing well. This is where the walls, fixtures and floor superstructures are being built on each floor. On the outside of the staircase 1, the facade insulation is currently under construction with the objective of installing it before the relaxing Christmas holidays can start.

<<see project>>