• EN
  • DE
array(6) { ["path"]=> string(19) "/var/www/html/media" ["url"]=> string(26) "https://www.wg-a.com/media" ["subdir"]=> string(0) "" ["basedir"]=> string(19) "/var/www/html/media" ["baseurl"]=> string(26) "https://www.wg-a.com/media" ["error"]=> bool(false) }
  • Home
  • News
  • About Us
    • Company
    • Team
    • Organization chart
    • Services
    • Integrated management system
    • Partners
    • Memberships
    • Media
    • Annual report
    • Code of Conduct
    • Imagevideo
    • Imprint
  • Projects
  • Sustainability
    • Sustainability
    • BIM
    • Building in Existing Contexts
    • Timber Construction
    • Modular Building
    • ESG | EU Taxonomy
    • Certification
  • Careers
  • Contact

WE EMPHASIZE GREAT IMPORTANCE ON
THE ENVIRONMENT AND SUSTAINABILITY

WE MEET HIGH STANDARDS OF QUALITY AND SUSTAINABILITY

WE ESTABLISH MODERN AND SUSTAINABLE EDUCATIONAL INSTITUTIONS

WE ARE RENOVATING GREAT BUILDINGS FROM THE PAST TO MAKE THEM READY FOR THE FUTURE

Latest NEWS

  • Primary School Schwarzenbek – Key milestones achieved – Important progress has been made on the construction site in recent weeks. Work in the area of the changing rooms in component C has seen successful progress. The dirt and rainwater pipes have been laid there and the preparatory granular … Continued
  • ASICS Austrian Women’s Run 2026 – Last Sunday, the Prater in Vienna turned into a vibrant setting full of energy, joie de vivre and sporting ambition. At the heart of it all was our WGA women’s running team, which took on the challenge of the ASICS … Continued
  • Office Trip – Vienna – Last Friday WGA’s Vienna team headed to Topgolf for this year’s office trip. With the skill levels ranging from absolute beginners to secret golf pros, the most important thing was having fun while playing golf together. There was a relaxed … Continued
  • ISTA Agricultural Centre, Maria Gugging – Interior work nearing completion – Construction is continuing to progress according to plan. Work on the upper floor is in full swing. Electrical installations, as well as the fitting of suspended ceilings and high-quality exposed timber cladding, are currently in full swing. The profiled glass … Continued
  • Fischamender Straße 46, Schwadorf – Foundation concreting and construction of the basement walls – The foundation slab is manufactured in sections in a total of three concreting stages. The connecting reinforcement for the later walls of the basement is already provided and professionally integrated. At the same time, the assembly of the first interior … Continued
WGA ZT GmbH | mail: office@wg-a.com
Imprint | Contact