Horner Strasse 97-99, Stockerau – Construction progress

Since December 2019, a retail park is being converted at Horner Strasse 97-99 in Stockerau. The existing hall is divided into four operating sections and the different construction volumes are architecturally combined by a sliding canopy hanging above it. In December, the interior and existing structures on the façade were taken down. Since the beginning of 2020, the interior work, including the building services and electrical engineering, is in progress and extra dome lights have been installed. The pivotal point of the project is the precast concrete canopy. Since February, we have been working on the formwork and the reinforcement with the greatest care. The concreting of the canopy is now about to start!

<<see project>>