Construction progress Hauptbahnhof C.18.B

Construction progress Hauptbahnhof C.18.B 22.02.2018

While there is snowfall outside and freezing temperatures, the construction work inside the building continues diligently. The screed has already been laid on the 2nd and 3rd floors of staircase 2, while the vapour barrier is laid on top of the pile on the 4th floor. In staircase 1, the pouring system is also already installed on the second and the first floor, the drywall erectors are installed on the 3rd and 4th floors. The embankment work in the stairwells will begin early next week.The last window on the first floor has also been installed and the preparatory work for the drywall construction in the office has started. A first sample of the room-high door frames has already been installed. Despite the wintry conditions, the installation of the mullion-transom façade in the inner courtyard has begun on the ground floor.

<<see project>>