Construction progress Stadlbreiten 9+11

Construction progress Stadlbreiten 9+11 27.03.2018

After the basement ceiling was completed, the walls on the ground floor could be constructed.
The slabs above the ground floor of building elements 1 and 2 have already been concreted.
In component 3, the element slabs and precast balcony elements were moved and the formwork task has started.