Construction progress Weinzingergasse

Construction progress Weinzingergasse 22.02.2019

The excellent weather conditions at the construction site allowed not only the ceiling above the cellar but also the first walls of the ground floor to be completed. The firewalls with semi-finished parts are elevated parallel to the remaining on-site concrete walls. At the same time, the ceiling above the garage ramp is being built at the back area of the property. This makes it possible to start the next phase as early as next week, with the ceiling above the ground floor.