Construction progress Wenhartgasse

Construction progress Wenhartgasse 02.08.2017

Despite the enormous temperatures on the construction site, the shell is growing. As soon as the ceiling above the first floor was concreted, the first formwork and hollow walls were already on the second floor. The staircases are already offset to the second floor. Parallel to the work on the above-ground components the construction of the garage ramp is being prepared.

 