Construction progress Wenhartgasse

Construction progress Wenhartgasse 01.03.2018

Despite the fact that no work is currently being carried out outside because the temperatures are significantly below freezing point, the completion is now within reach. The wall and floor tiles in the apartments were laid. After the walls and ceilings had been filled, also the wooden floor could already be laid in the first apartments. At the same time, the electricians assemble the switches and sockets. The assembly of the sanitary ware has also already begun.