Dröpkeweg 2-12, Berlin – The sub-basement is under construction

After the digging work was completed, the foundation and the walls of the basement were concreted. In the meantime, the work has progressed so far that the placement of the pipes and the location of the rooms are becoming visible. The light shaft has been positioned on the external wall of the basement. Soon, the ceiling above the basement and the foundation of the ground floor will be constructed.