Ellener Hof, Bremen – Interior work in progress

The non-load-bearing internal walls and the facing shells of the KLH flat partitions have been erected for all the apartments. The flat stations, consisting of media, electrical, and heating distribution cabinets, have been installed in the conventional drywalls provided for this purpose. As part of the flooring works, the required edge insulation strips and staple plates, to which the underfloor heating pipes are attached, were installed in all units.