Work is currently underway on the facade of Hauptstraße 30 in the market town of Hinterbrühl. The insulation and levelling of the façade has been completed, as has the installation of windows in the apartments. Inside, the walls have been levelled, pipes laid and cables installed. The screed has been laid and is now drying. Once it is completely dry, the next step will be to lay the tiles.