The attractive residential building with ten residential units is taking shape. The street façade has been completed, so that the final design of the residential building can already be seen behind the scaffolding. The screed was laid in the interior and the parquet flooring will soon be laid. The bathrooms have already been tiled and prepared for the installation of the sanitary fittings.
The electrical work is also already in progress. The cabling and wiring have already been completed. The roof panelling will also be completed in the upcoming weeks.