Educational Campus Seestadt Aspern North, Vienna – The interior work is already in an advanced stage

The interior works at the Liselotte Hansen – Schmidt Education Campus are progressing well. Currently, the floor screed work and the installation of the suspended ceilings are being carried out in some parts of the building. The suspended ceiling in the basement area is almost finished and the dry walls will be sealed as well as the door frames will be painted. The finishing of the sports halls is also far ahead of the schedule. The wooden cladding of the walls and ceilings is quickly installed, so that the final appearance of the gymnasiums can already be anticipated.
On the 1st floor of building section B, the remaining drywall is currently being fitted. In part A and C, the walls are already sealed, the screed is concreted and the substructure for the sus-pended ceiling is being installed. On the first floor of building section A, the last concreting work of the screed is taking place and on building section C, the filling is already in place.
In the exterior area, the balustrade cladding and the railings have already been assembled to a large extent and the substructure for the Alucobond façade has also been completed almost everywhere.

 

<<see project>>