Opening ceremony Effenbergplatz

Effenbergplatz

Opening ceremony Effenbergplatz 14.09.17 On 14.09.2017 the opening ceremony of the DOHO dormitory took place as the crowning conclusion of the project Effenbergplatz. Despite the stormy weather conditions many participants came to the ceremony and enjoyed the evening at Kaisermühlenstrasse … Continued

End of construction Effenbergplatz

Effenbergplatz

End of construction Effenbergplatz 18.08.2017 On 18.08.2017 the two components Kaisermühlenstraße 12 and 16 were finished and as a general planner we were able to transfer the project successfully to our client. In only 17 months of construction the two … Continued

Construction progress Effenbergplatz

Baufortschritt Effenbergplatz

Construction progress Effenbergplatz 21.07.2017 We are approaching the finish line in speedy steps. The last painting work is carried out in component 3, the walls and the ceilings are painted in the aisles and in the stairwell. Also the flooring … Continued

Effenbergplatz, Vienna

Project information

Procedure
Selection procedure
Client
Kaiserspitz Immobilien GmbH & Co KG
Tiroler Strasse 20
3105 St. Pölten-Unterradlberg

Kaiserquadrat Immobilien GmbH & Co KG
Tiroler Strasse 20
3105 St. Pölten-Unterradlberg
Principal
HOTT Bauträger- und Verwaltungs GmbH
Doningasse 12, Stiege 1, 2.OG, Top 05
1220 Vienna
Address
Effenbergplatz, Kaisermühlenstrasse, 1220 Vienna
Start of planning
09/2014
Start of construction works
03/2016
Completion
08/2017
Construction costs
8,35 Mio. (net)
Size of order
Overall planning

With this project a combination of student residential hall and smart residential living emerges directly on one of the new urban intersections of the 22nd Viennese district. This unique location features an ideal connection to public transport (U2 station Donaustadtbrücke) and at the same time offers with the “Alte Donau” in walking distance one of the most beautiful local recreation areas in town.

These differing aspects, with small scale structures and a high proportion of green spaces on one hand and the formative alignment of the new U2 trail on the other hand, are reflected in the two building structures.

The project is divided into lot 3 on the corner of “Kaisermühlenstrasse” and “Am Kaisermühlendamm” and lot 4 on the “Kaisermühlenstrasse”. The separate structures are linked through a common visual language.

The bigger building no. 3 houses 108 units and perfectly fits into the existing street fabric through its varying building heights. Each unit has its own outdoor space in shape of a balcony, loggia or terrace.

The building no. 4 consists of 57 units. Its slender structure with an access balcony on the east side enables an ideal illumination with as great a distance to the underground as possible. The building opens up to the west with balconies and loggias overlooking the “Alte Donau”. In order to gain valuable residential space, the rubbish room is situated underneath the underground trail alongside the car and cycle parking.