Schäffergasse 10-12, Vienna – Plant troughs are being mounted

The indoor stair railings have already been installed as well as the tiling and parquet flooring on the last floors. The façades facing Pressgasse and Schäffergasse have been filled and the plant troughs and the frames with stainless steel wire netting are currently being installed. The insulation is installed on the inner courtyard façades and the filling has started.