• EN
  • DE
array(6) { ["path"]=> string(19) "/var/www/html/media" ["url"]=> string(26) "https://www.wg-a.com/media" ["subdir"]=> string(0) "" ["basedir"]=> string(19) "/var/www/html/media" ["baseurl"]=> string(26) "https://www.wg-a.com/media" ["error"]=> bool(false) }
  • Home
  • News
  • About Us
    • Company
    • Team
    • Organization chart
    • Services
    • Integrated management system
    • Partners
    • Memberships
    • Media
    • Annual report
    • Code of Conduct
    • Imagevideo
    • Imprint
  • Projects
  • Sustainability
    • Sustainability
    • BIM
    • Building in Existing Contexts
    • Timber Construction
    • Modular Building
    • ESG | EU Taxonomy
    • Certification
  • Careers
  • Contact

Construction Progress

Effenbergplatz building site 1+2, Vienna – The first floor is under construction

14.04.2022

The first floor is almost finished and the last ceiling parts are concreted. This floor forms the basis of the entire building complex. The area will later be used both as a garage and as commercial space. On the 1st … Continued

Dröpkeweg 2-12, Berlin – The supply lines are going to be laid

13.04.2022

The substructures of the conventional drywalls were erected. The supply lines to the apartments are installed in the corridors. The laying of the supply lines and the assembly of the distribution cabinets are carried out inside the apartments. The meter … Continued

Omega Haus, Offenbach am Main – The electrical lines are going to be laid and the walls are closed

11.04.2022

The expansion work is progressing rapidly in the model zone. The metal stud walls of all sanitary rooms have already been planked on one side. The mounting frames for and the installations of the sanitary items are also built into … Continued

Schäffergasse 10-12, Vienna – The ground floor is beginning to take shape

31.03.2022

The walls on the first basement floor are standing, the ceiling has already been completely formed and the concreting work on the ceiling will soon be completed. On the ground floor the formwork for the walls is already being erected … Continued

Christian-Bucher-Gasse 15-17, Vienna – The basement is already completed

28.03.2022

After completion of the shell construction work in the basement, the two parts of the building are now rising rapidly above. The later building configuration, with one component facing the street and four terraced houses in the garden area behind, … Continued

Erzherzog-Karl-Strasse 176, Vienna – The top floors are under construction

28.03.2022

With spring-like temperatures and the best construction weather, the shell of the building is rising towards the top floors. In the most advanced phase of the construction, the first sloping roof elements can already be seen. At the same time, … Continued

Gesundheitswelt Ost, Wr. Neustadt – The second floor is under construction

17.03.2022

Despite the often cold and windy weather conditions, the shell construction work is progressing well. The walls of the first floor are completely concreted. The work on the ceiling above the first floor is in its final phase. The walls … Continued

Cumberlandstraße 38, Vienna – A lot has happened in the last few weeks

07.03.2022

In the north-eastern part the thermal insulation composite system is currently being installed. The screed in the staircase has already been laid and the tilers have started their work. In the southern component, the shell construction work is entering the … Continued

Omega Haus, Offenbach am Main – A lot is happening in interior and exterior construction

03.03.2022

The construction work inside the Omega house is progressing rapidly. The first ceiling installations are currently being assembled in the area of ​​the future aisle cladding. This already gives an idea of ​​how the new ventilation system supplies the individual … Continued

Schäffergasse 10-12, Vienna – The structural work of the basement floors is progressing rapidly

28.02.2022

The ceiling above the second basement level has now been fully concreted and half of the bracing required for the process has already been removed. At the moment the formwork for the walls of the first basement is in progress. … Continued

  • ← Older posts
  • Newer posts →

Archiv

  • March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September June
  • Categories

    • BIM
    • Construction Progress
    • Construction Start
    • End of construction
    • Others
    • Our company location
    • Site Visit
    • Sustainability
    • Uncategorized
    • WGA team
    WGA ZT GmbH
    Bloch-Bauer-Promenade 21
    1100 Vienna
    +43 1 320 3551-0
    office@wg-a.com
    WGA Deutschland GmbH
    Wilhelmine-Gemberg-Weg 6, entrance D
    10179 Berlin
    +49 30 240 08 97-0
    deutschland@wg-a.com
    WGA Deutschland GmbH
    Hanauer Landstraße 136A/101
    60314 Frankfurt on the Main
    +49 69 580 02 69-0
    deutschland@wg-a.com
    Imprint
    © 2026 WGA ZT GmbH