• EN
  • DE
array(6) { ["path"]=> string(19) "/var/www/html/media" ["url"]=> string(26) "https://www.wg-a.com/media" ["subdir"]=> string(0) "" ["basedir"]=> string(19) "/var/www/html/media" ["baseurl"]=> string(26) "https://www.wg-a.com/media" ["error"]=> bool(false) }
  • Home
  • News
  • About Us
    • Company
    • Team
    • Organization chart
    • Services
    • Integrated management system
    • Partners
    • Memberships
    • Media
    • Annual report
    • Code of Conduct
    • Imagevideo
    • Imprint
  • Projects
  • Sustainability
    • Sustainability
    • BIM
    • Building in Existing Contexts
    • Timber Construction
    • Modular Building
    • ESG | EU Taxonomy
    • Certification
  • Careers
  • Contact

Monthly Archives: July 2020

Educational Campus Aron Menczer, Vienna – The interior construction is progressing well

31.07.2020

The construction work is in full progress. In the last few weeks, the HVAC installations (heating, air conditioning, ventilation, plumbing, electrical) and the drywall construction work on the 2nd floor have started on the construction site. Meanwhile, the walls on … Continued

Stadlauer Strasse 64, Vienna – From the visualization to reality

29.07.2020

The Stadlau residential park is beginning to show its shape! During our last site inspection we could already notice amazing progress: As a final step, the screed work on staircase 1 has now also been completed. The parquet and tiles … Continued

Fasanstrasse 1a-c, Pixendorf – The topping-out ceremony took place on 15th July 2020

17.07.2020

In pleasant summer temperatures, the topping-out ceremony for the building project took place on 15th July 2020 in Fasanstrasse 1a in Pixendorf. Although there was occasional light rain, this did not spoil the great atmosphere. Representatives of Lukas Lang Building … Continued

Hofwiesengasse 12, Vienna – The residential complex has been completed

16.07.2020

The residential building complex in the 13th district of Vienna has been completed in partnership with STRABAG AG as the general contractor after a construction period of 22 months. Divided over four staircases, a total of 79 flats with their … Continued

Rugierstrasse 55, Vienna – The structural work has already reached the top floor

13.07.2020

The construction work on the framework at Rugierstrasse 55 has now reached the top floor. While in the staircase 1 the floor ceiling is being constructed directly underneath, the top walls are already being constructed in the part of the … Continued

Kindergarten Schwadorf – The official ground-breaking ceremony was held

03.07.2020

The building site of the kindergarten, right next to the Schwadorf elementary school, received a positive response from everyone involved. By the end of August of the following year, a two-group kindergarten with an exercise room will be realized here. … Continued

Gailenbachweg 5, Salzburg – The first partial handover will already take place in September

03.07.2020

The components of the PRISMA (components N5-N7) are being worked on at full speed for the handover in September. The underground parking garage is also being worked on quickly so that it can be partially opened at the same time … Continued

Wagramer Strasse 115-117, Vienna – The structural work has been completed

03.07.2020

After the structural work has been completed, the scaffolding of the facade has already started. In the upcoming weeks, the thermal insulation composite system will be attached to the facade. On the flat roof, the sealing work is in progress … Continued

Fasanstrasse 1a-c, Pixendorf – The construction work is in full progress

02.07.2020

The construction work inside the building continues in parts 1 and 2. The floors in the apartments will shortly be finished, the perlite leveling and insulation fill has been applied in every room and the dry screed panels with underfloor … Continued

Leopoldauer Strasse 72, Vienna – The casing works have already started

01.07.2020

In order to make the construction work for the new residential complex at Leopoldauer Strasse 72 easier, the site was divided into three sections.The first section is located on Ichagasse. Here the exterior walls are already in place and the … Continued

  • ← Older posts

Archiv

  • May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September June
  • Categories

    • BIM
    • Construction Progress
    • Construction Start
    • End of construction
    • Others
    • Our company location
    • Site Visit
    • Sustainability
    • Uncategorized
    • WGA team
    WGA ZT GmbH
    Bloch-Bauer-Promenade 21
    1100 Vienna
    +43 1 320 3551-0
    office@wg-a.com
    WGA Deutschland GmbH
    Wilhelmine-Gemberg-Weg 6, entrance D
    10179 Berlin
    +49 30 240 08 97-0
    deutschland@wg-a.com
    WGA Deutschland GmbH
    Hanauer Landstraße 136A/101
    60314 Frankfurt on the Main
    +49 69 580 02 69-0
    deutschland@wg-a.com
    Imprint
    © 2025 WGA ZT GmbH