• EN
  • DE
array(6) { ["path"]=> string(19) "/var/www/html/media" ["url"]=> string(26) "https://www.wg-a.com/media" ["subdir"]=> string(0) "" ["basedir"]=> string(19) "/var/www/html/media" ["baseurl"]=> string(26) "https://www.wg-a.com/media" ["error"]=> bool(false) }
  • Home
  • News
  • About Us
    • Company
    • Team
    • Organization chart
    • Services
    • Integrated management system
    • Partners
    • Memberships
    • Media
    • Annual report
    • Code of Conduct
    • Imagevideo
    • Imprint
  • Projects
  • Sustainability
    • Sustainability
    • BIM
    • Building in Existing Contexts
    • Timber Construction
    • Modular Building
    • ESG | EU Taxonomy
    • Certification
  • Careers
  • Contact

Construction Progress

Obersteinergasse 11, Vienna – Roof terraces are almost completed

22.06.2023

In the last attic floors the parquet installation is in full swing. The roof terraces are almost finished – the porcelain stoneware tiles have already been laid and the installation of the privacy walls is in progress. The railings on … Continued

Omega Haus, Offenbach am Main – Improvements for tenants in section C are well under way

15.06.2023

The insulation boards are already being inserted between the stud profiles of the corridor walls that divide the rooms in the tenants’ area that is currently being extended. Some of the metal stud frames are already being planked and filled … Continued

Friedhofstrasse 4, Wiener Neudorf – Completion of the building structure is getting closer

15.06.2023

There has been noticeable progress on the construction site each week thanks to the use of semi-prefabricated walls and prefabricated ceilings. While the reinforced concrete work in the first phase has reached the walls on the first floor, the ceiling … Continued

Effenbergplatz Building Site 1+2, Vienna – Tiling work is progressing rapidly

15.06.2023

Progress on the construction project is continuing. The floors in building section 2 have already been tiled from the 1st floor to the 6th floor, whilst in building section 1, the tiled floors extend from the 3rd floor to the … Continued

Retirement Home Alfons Maria, Gablitz – Waterproofing membranes laid on roof

26.05.2023

The finishing work on the new nursing home in Gablitz is progressing rapidly after the topping-out ceremony to celebrate the completion of the structural work in March. Up on the roof, the shaft heads, skylight domes, and equipment foundations have … Continued

Gesundheitswelt Ost, Wiener Neustadt – Final completion work

08.05.2023

The construction work is approaching the final stages and the completion work is being done throughout the building. The flooring has been laid on the upper floors while the walls and ceilings have been painted. In the hotel lobby and … Continued

Friedhofstraße 4, Wiener Neudorf – Structural work is progressing rapidly

04.05.2023

Following the construction of the retention basin and the basement, the breakthrough has already been made in the neighbouring building. This will create a connection to the adjacent building and build the future access road to the new underground car … Continued

Effenbergplatz Building Site 1+2, Vienna – Drywall construction work in component 1

04.05.2023

Progress on the construction project continues. The substructure of the façade cladding of component 2 “Anton” on the east side has been completed and work on the north side is currently in full swing. In addition, the crane was dismantled. … Continued

Conrad-Blenkle-Straße 36, Berlin – Second basement is under construction

04.05.2023

The ceiling under the 2nd basement floor has already been completed and the rough work for the column and walls on this floor is also being done. The preparations for the backfilling of the excavation pit 2nd basement are in … Continued

Omega Haus, Offenbach am Main – Room divisions for first tenants

03.05.2023

The first expansion for the tenants started in the Omega Haus. Based on the basic construction, the metal stud walls are currently being installed for the future tenant’s room divisions. In addition to a large number of cellular offices, several … Continued

  • ← Older posts
  • Newer posts →

Archiv

  • November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September August July June May April March February January
  • December November October September June
  • Categories

    • BIM
    • Construction Progress
    • Construction Start
    • End of construction
    • Others
    • Our company location
    • Site Visit
    • Sustainability
    • Uncategorized
    • WGA team
    WGA ZT GmbH
    Bloch-Bauer-Promenade 21
    1100 Vienna
    +43 1 320 3551-0
    office@wg-a.com
    WGA Deutschland GmbH
    Wilhelmine-Gemberg-Weg 6, entrance D
    10179 Berlin
    +49 30 240 08 97-0
    deutschland@wg-a.com
    WGA Deutschland GmbH
    Hanauer Landstraße 136A/101
    60314 Frankfurt on the Main
    +49 69 580 02 69-0
    deutschland@wg-a.com
    Imprint
    © 2025 WGA ZT GmbH